Appearance
question:As a concerned resident of Alexander County, you are analyzing the water quality of the local river. The water flow in the river follows a sinusoidal pattern due to seasonal changes. The flow rate ( Q(t) ) in cubic meters per second can be modeled by the function:[ Q(t) = 50 + 30sinleft(frac{pi t}{6}right) ]where ( t ) is the time in months, and ( t = 0 ) corresponds to January.1. Determine the total volume of water that flows through the river over the course of one year. 2. The county has a water treatment plant that can handle a maximum flow rate of 75 cubic meters per second. Calculate the exact times during the year when the flow rate exceeds this capacity. Use your advanced calculus and trigonometric skills to solve these problems.
answer:Alright, so I'm trying to figure out these two problems about the water flow in the river. Let me take it step by step.First, the problem says that the flow rate Q(t) is given by the function:[ Q(t) = 50 + 30sinleft(frac{pi t}{6}right) ]where t is the time in months, starting from January when t=0. Problem 1 asks for the total volume of water that flows through the river over one year. Hmm, okay. So, since volume is flow rate multiplied by time, I think I need to integrate the flow rate over the period of one year, which is 12 months. That makes sense because integrating Q(t) from t=0 to t=12 should give me the total volume.So, the formula for total volume V is:[ V = int_{0}^{12} Q(t) , dt ]Substituting the given Q(t):[ V = int_{0}^{12} left(50 + 30sinleft(frac{pi t}{6}right)right) dt ]Alright, let me break this integral into two parts for easier calculation:[ V = int_{0}^{12} 50 , dt + int_{0}^{12} 30sinleft(frac{pi t}{6}right) dt ]Calculating the first integral:[ int_{0}^{12} 50 , dt = 50t bigg|_{0}^{12} = 50(12) - 50(0) = 600 ]Okay, that part is straightforward. Now, the second integral:[ int_{0}^{12} 30sinleft(frac{pi t}{6}right) dt ]I remember that the integral of sin(ax) dx is -(1/a)cos(ax) + C. So, applying that here.Let me set u = (π t)/6, so du/dt = π/6, which means dt = (6/π) du.But maybe I can just do a substitution step by step.Let’s let u = (π t)/6, then du = (π/6) dt, so dt = (6/π) du.But perhaps it's easier to just compute the integral directly.The integral becomes:[ 30 times left( -frac{6}{pi} cosleft(frac{pi t}{6}right) right) bigg|_{0}^{12} ]Simplify that:[ -frac{180}{pi} cosleft(frac{pi t}{6}right) bigg|_{0}^{12} ]Now, evaluating from 0 to 12:At t=12:[ cosleft(frac{pi times 12}{6}right) = cos(2pi) = 1 ]At t=0:[ cosleft(frac{pi times 0}{6}right) = cos(0) = 1 ]So, plugging these in:[ -frac{180}{pi} [1 - 1] = -frac{180}{pi} times 0 = 0 ]Wait, so the second integral is zero? That seems a bit strange, but thinking about it, the sine function is symmetric over its period, so the area above the x-axis cancels out the area below. Since we're integrating over a full period (12 months, which is the period of the sine function here), the integral indeed cancels out. So, the second integral is zero.Therefore, the total volume V is just 600 cubic meters. Hmm, but wait, is that in cubic meters? The flow rate is in cubic meters per second, so integrating over 12 months would give us cubic meters per second multiplied by seconds, which is cubic meters. But wait, actually, hold on.Wait, the flow rate is in cubic meters per second, but t is in months. So, we need to make sure the units are consistent. Because if we integrate Q(t) over t in months, the units would be cubic meters per second multiplied by months, which doesn't make sense. So, I think I made a mistake here.Wait, hold on. Let me double-check. The function Q(t) is given as cubic meters per second, and t is in months. So, integrating Q(t) over t (months) would give cubic meters per second multiplied by months, which isn't a standard unit for volume. So, I think I need to convert the time units so that when I integrate, the units make sense.So, volume is flow rate multiplied by time. So, if Q(t) is in m³/s, and time is in seconds, then integrating over seconds would give m³. But in this case, t is in months, so I need to convert t to seconds to make the units consistent.Alternatively, maybe the function is defined such that Q(t) is in m³/s, and t is in months, but when we integrate over t in months, we need to convert the time units.Wait, perhaps it's better to convert the time from months to seconds before integrating.So, let me think. There are 30 days in a month roughly, but actually, to be precise, since the function is defined with t in months, but the flow rate is in m³/s, so perhaps the integral over t in months would require multiplying by the number of seconds in a month.Wait, this is getting confusing. Maybe I should convert the entire integral into seconds.Alternatively, perhaps the question is expecting the total volume in terms of cubic meters per second multiplied by months, but that doesn't make sense. So, maybe the function is actually in cubic meters per month? But the problem says cubic meters per second.Wait, let me go back to the problem statement."the flow rate Q(t) in cubic meters per second can be modeled by the function..."So, yes, Q(t) is in m³/s, and t is in months. So, to get the total volume in m³, we need to integrate Q(t) over time in seconds.But since t is given in months, perhaps we need to express the integral in terms of seconds.Wait, maybe I should express the integral as:Total volume V = ∫ Q(t) dt, where dt is in seconds.But since t is in months, we need to convert t to seconds.So, 1 month is approximately 30 days, which is 30*24*3600 seconds. Let me compute that.30 days * 24 hours/day = 720 hours720 hours * 3600 seconds/hour = 2,592,000 seconds.So, 1 month ≈ 2,592,000 seconds.Therefore, t in months can be converted to seconds by multiplying by 2,592,000.But wait, actually, in our integral, we have t in months, so if we want to integrate over time in seconds, we need to express t as t_sec = t_month * 2,592,000.But this might complicate things. Alternatively, perhaps the function is given with t in months, but the integral is over t in months, so the units would be (m³/s) * month, which isn't standard.Wait, maybe the question is expecting the answer in terms of cubic meters per second multiplied by months, but that seems odd.Alternatively, perhaps the function is actually in cubic meters per month, but the problem says cubic meters per second. Hmm.Wait, maybe I misread the problem. Let me check again."the flow rate Q(t) in cubic meters per second can be modeled by the function..."Yes, it's cubic meters per second.So, perhaps the integral over t in months is not the right approach. Maybe I need to convert t to seconds.Wait, but t is given in months, so perhaps the function is periodic with period 12 months, but in terms of seconds, the period would be 12*2,592,000 seconds.But this seems complicated. Maybe I'm overcomplicating it.Wait, perhaps the question is just expecting the integral over t from 0 to 12, treating t as a unitless variable, but with Q(t) in m³/s, so the integral would be in m³/s * t_unit. But since t is in months, the units would be m³/s * month, which isn't standard.Wait, maybe the question is actually expecting the average flow rate multiplied by the time period. Since the sine function averages out to zero over a full period, the average flow rate is just 50 m³/s. So, over one year, which is 12 months, but we need to convert that to seconds.Wait, that might make sense. So, if the average flow rate is 50 m³/s, then the total volume over one year would be 50 m³/s multiplied by the number of seconds in a year.Yes, that seems more reasonable.So, let's compute that.First, compute the number of seconds in a year. Assuming a non-leap year, which has 365 days.365 days * 24 hours/day = 8,760 hours8,760 hours * 3600 seconds/hour = 31,536,000 seconds.So, total volume V = average flow rate * time = 50 m³/s * 31,536,000 s = 1,576,800,000 m³.But wait, that's a huge number. Let me check if that makes sense.Wait, 50 m³/s is quite a high flow rate. For example, the Amazon River has an average discharge of about 209,000 m³/s, so 50 m³/s is much smaller, but still, over a year, it would accumulate to a large volume.But let me think again. If I integrate Q(t) over t in months, I get 600, but that's in m³/s * months, which isn't standard. So, perhaps the correct approach is to compute the average flow rate and then multiply by the total time in seconds.Since the sine function has an average value of zero over a full period, the average flow rate is just 50 m³/s. Therefore, over one year, the total volume is 50 m³/s * 31,536,000 s = 1,576,800,000 m³.But let me verify this with the integral approach, making sure to convert t to seconds.So, let's express t in seconds. Let me denote t_sec as the time in seconds. Since t is given in months, and 1 month ≈ 2,592,000 seconds, t_sec = t_month * 2,592,000.But in the function Q(t), t is in months, so we can write:Q(t_month) = 50 + 30 sin(π t_month / 6)But if we want to express Q as a function of t_sec, we need to express t_month in terms of t_sec.t_month = t_sec / 2,592,000So, substituting:Q(t_sec) = 50 + 30 sin(π (t_sec / 2,592,000) / 6) = 50 + 30 sin(π t_sec / (6 * 2,592,000))Simplify the argument:6 * 2,592,000 = 15,552,000So, Q(t_sec) = 50 + 30 sin(π t_sec / 15,552,000)Now, the period of this sine function is 2 * 15,552,000 / π seconds, which is approximately 9,932,096 seconds, which is roughly 115 days. Wait, that doesn't make sense because the period should be 12 months, which is about 365 days. Hmm, seems like a miscalculation.Wait, no, actually, the period of the original function Q(t_month) is 12 months because sin(π t /6) has a period of 12 months. So, when we convert t to seconds, the period should still be 12 months, which is 31,536,000 seconds.Wait, let's compute the period of Q(t_sec). The general form is sin(B t), where the period is 2π / B.In our case, B = π / (6 * 2,592,000) = π / 15,552,000So, the period is 2π / (π / 15,552,000) ) = 2 * 15,552,000 = 31,104,000 seconds.Wait, 31,104,000 seconds is approximately 362 days, which is close to a year but not exactly. Hmm, but since we're dealing with an approximation of a month as 2,592,000 seconds, which is exactly 30 days, so 12 months would be 360 days, which is 31,104,000 seconds. So, the period is 31,104,000 seconds, which is 12 months of 30 days each.So, the function Q(t_sec) has a period of 31,104,000 seconds, which is 12 months.Therefore, to compute the total volume over one year, we can integrate Q(t_sec) from t=0 to t=31,104,000 seconds.But that seems complicated. Alternatively, since the average value of the sine function over its period is zero, the average flow rate is 50 m³/s, so the total volume is 50 * 31,104,000 = 1,555,200,000 m³.Wait, but earlier I calculated 31,536,000 seconds in a year (365 days), which would give 50 * 31,536,000 = 1,576,800,000 m³.Hmm, so which one is correct? It depends on whether we're considering a year as 365 days or 12 months of 30 days each.Since the problem defines t=0 as January, and t in months, it's likely that the period is 12 months, each of 30 days, so 360 days. Therefore, the total time is 31,104,000 seconds, leading to 1,555,200,000 m³.But wait, the problem doesn't specify whether it's a leap year or not, or whether it's considering months as 30 days each. It just says t is in months, t=0 is January.So, perhaps the question is expecting us to treat t as a continuous variable over 12 months, without worrying about the exact number of days. Therefore, integrating Q(t) over t from 0 to 12, treating t as unitless, but with Q(t) in m³/s.But then, as I thought earlier, the units would be m³/s * month, which isn't standard. So, maybe the question is expecting the answer in terms of cubic meters per second multiplied by months, but that seems odd.Alternatively, perhaps the question is actually expecting the total volume in cubic meters, so we need to convert the integral into seconds.Wait, let me try this approach.Express the integral in terms of t in seconds.We have Q(t_month) = 50 + 30 sin(π t_month /6)But t_month = t_sec / 2,592,000So, Q(t_sec) = 50 + 30 sin(π (t_sec / 2,592,000) /6 ) = 50 + 30 sin(π t_sec / 15,552,000)Now, the total volume V is:V = ∫₀^{31,104,000} Q(t_sec) dt_sec= ∫₀^{31,104,000} [50 + 30 sin(π t_sec / 15,552,000)] dt_secThis integral can be split into two parts:= ∫₀^{31,104,000} 50 dt_sec + ∫₀^{31,104,000} 30 sin(π t_sec / 15,552,000) dt_secFirst integral:= 50 * 31,104,000 = 1,555,200,000 m³Second integral:Let me compute ∫ 30 sin(π t / 15,552,000) dt from 0 to 31,104,000Let’s make a substitution:Let u = π t / 15,552,000Then, du/dt = π / 15,552,000So, dt = (15,552,000 / π) duWhen t=0, u=0When t=31,104,000, u= π * 31,104,000 / 15,552,000 = 2πSo, the integral becomes:30 * ∫₀^{2π} sin(u) * (15,552,000 / π) du= 30 * (15,552,000 / π) ∫₀^{2π} sin(u) du= 30 * (15,552,000 / π) [ -cos(u) ]₀^{2π}= 30 * (15,552,000 / π) [ -cos(2π) + cos(0) ]= 30 * (15,552,000 / π) [ -1 + 1 ] = 0So, the second integral is zero, as expected.Therefore, the total volume V is 1,555,200,000 m³.But wait, earlier I thought of 31,536,000 seconds in a year, which would give 50 * 31,536,000 = 1,576,800,000 m³.So, which one is correct? It depends on whether we're considering a year as 365 days or 12 months of 30 days each.Given that the problem defines t in months, starting from January, it's likely that they are considering a year as 12 months, each of 30 days, so 360 days. Therefore, the total time is 31,104,000 seconds, leading to 1,555,200,000 m³.But let me check the problem statement again."the flow rate Q(t) in cubic meters per second can be modeled by the function..."So, Q(t) is in m³/s, and t is in months. So, to compute the total volume over one year, we need to integrate Q(t) over the time period of one year, which is 12 months. But since Q(t) is in m³/s, and t is in months, we need to convert the time units.Wait, perhaps the correct approach is to compute the integral of Q(t) over t in months, but then multiply by the number of seconds in a month to get the volume.Wait, that might make sense. So, if we compute the integral ∫₀^{12} Q(t) dt, where dt is in months, and then multiply by the number of seconds in a month to convert the units.But that seems a bit convoluted. Alternatively, perhaps the integral ∫₀^{12} Q(t) dt gives the volume in m³/s * months, which isn't standard, so we need to convert the units.Wait, maybe it's better to think of it as:Total volume = ∫₀^{12} Q(t) * (number of seconds in a month) dtBut since each month has approximately 2,592,000 seconds, we can write:Total volume = ∫₀^{12} Q(t) * 2,592,000 dtBut then, since Q(t) is in m³/s, multiplying by seconds gives m³, and integrating over months would give m³ * months, which still isn't standard.Wait, I'm getting confused. Maybe I should take a different approach.Since the flow rate is given as Q(t) = 50 + 30 sin(π t /6), with t in months, and Q(t) in m³/s, the total volume over one year is the integral of Q(t) over the year, but in terms of time in seconds.So, perhaps the correct way is to express t in seconds, convert the function accordingly, and then integrate.But as we saw earlier, that leads to a total volume of 1,555,200,000 m³.Alternatively, since the average flow rate is 50 m³/s, over 12 months, which is 31,104,000 seconds, the total volume is 50 * 31,104,000 = 1,555,200,000 m³.So, I think that's the answer.But let me check with the initial integral approach.If I compute ∫₀^{12} Q(t) dt, where Q(t) is in m³/s and t is in months, the result is in m³/s * months. To convert this to m³, I need to multiply by the number of seconds in a month.So, ∫₀^{12} Q(t) dt = 600 m³/s * monthsBut 1 month ≈ 2,592,000 seconds, so 12 months ≈ 31,104,000 seconds.Wait, no, the integral is 600 m³/s * months, which is 600 * 12 m³/s * month, which is 7200 m³/s * month.But that's not helpful. Alternatively, perhaps the integral ∫₀^{12} Q(t) dt is 600 m³/s * months, which can be converted to m³ by multiplying by the number of seconds in a month.Wait, no, that's not correct. The integral ∫ Q(t) dt is in m³/s * t_unit, where t_unit is months. To convert this to m³, we need to multiply by the number of seconds in a month.Wait, no, actually, the integral ∫ Q(t) dt from t=0 to t=12 is in m³/s * months. To convert this to m³, we need to multiply by the number of seconds in a month.Wait, no, that's not right. Let me think carefully.If I have Q(t) in m³/s, and I integrate over t in months, the result is m³/s * months. To convert this to m³, I need to multiply by the number of seconds in a month.So, total volume V = (∫₀^{12} Q(t) dt) * (seconds per month)We have ∫₀^{12} Q(t) dt = 600 m³/s * monthsSo, V = 600 * (seconds per month) m³But 1 month ≈ 2,592,000 seconds, so:V = 600 * 2,592,000 = 1,555,200,000 m³Which matches the earlier result.Therefore, the total volume is 1,555,200,000 cubic meters.Okay, that seems consistent.So, for problem 1, the total volume is 1,555,200,000 m³.Now, moving on to problem 2.The county has a water treatment plant that can handle a maximum flow rate of 75 cubic meters per second. We need to find the exact times during the year when the flow rate exceeds this capacity.So, we need to solve for t in [0,12] where Q(t) > 75 m³/s.Given Q(t) = 50 + 30 sin(π t /6) > 75So, let's write the inequality:50 + 30 sin(π t /6) > 75Subtract 50 from both sides:30 sin(π t /6) > 25Divide both sides by 30:sin(π t /6) > 25/30 = 5/6 ≈ 0.8333So, we need to find all t in [0,12] such that sin(π t /6) > 5/6.Let me recall that sin(θ) > 5/6 occurs in two intervals within [0, 2π]: between θ1 and π - θ1, where θ1 = arcsin(5/6).So, let's compute θ1 = arcsin(5/6).Using a calculator, arcsin(5/6) ≈ arcsin(0.8333) ≈ 0.9851 radians.So, sin(θ) > 5/6 when θ ∈ (0.9851, π - 0.9851) ≈ (0.9851, 2.1565) radians.Now, since θ = π t /6, we can write:π t /6 ∈ (0.9851, 2.1565)Multiply all parts by 6/π:t ∈ (0.9851 * 6 / π, 2.1565 * 6 / π)Compute these values:First, 0.9851 * 6 ≈ 5.91065.9106 / π ≈ 1.881 monthsSecond, 2.1565 * 6 ≈ 12.93912.939 / π ≈ 4.117 monthsSo, the first interval where Q(t) > 75 is t ∈ (1.881, 4.117) months.But since the sine function is periodic, we need to check if there's another interval in the next period.Wait, the period of sin(π t /6) is 12 months, so within [0,12], this is the only interval where sin(π t /6) > 5/6.Wait, let me confirm.The sine function reaches its maximum at t = 3 months (since sin(π*3/6) = sin(π/2) = 1). So, the function increases from t=0 to t=3, then decreases from t=3 to t=6, and so on.So, the sine function is above 5/6 in two intervals within each period: once on the rising part and once on the falling part.Wait, no, actually, in the interval [0,12], the sine function goes from 0 to 1 to 0 to -1 to 0. So, sin(π t /6) > 5/6 occurs only once in the rising part and once in the falling part.Wait, but in our case, since we're dealing with sin(π t /6), which has a period of 12 months, and it's symmetric around t=6 months.Wait, let me plot the function mentally.At t=0: sin(0) = 0At t=3: sin(π/2) = 1At t=6: sin(π) = 0At t=9: sin(3π/2) = -1At t=12: sin(2π) = 0So, the function is above 5/6 between t1 and t2, where t1 is when it crosses 5/6 on the way up, and t2 is when it crosses 5/6 on the way down.Wait, but in the interval [0,6], the function goes from 0 to 1 to 0. So, it crosses 5/6 twice: once on the way up (t1) and once on the way down (t2).Similarly, in the interval [6,12], the function goes from 0 to -1 to 0, so it doesn't cross 5/6 again because 5/6 is positive.Therefore, in [0,12], sin(π t /6) > 5/6 only in the interval (t1, t2), where t1 is the first crossing and t2 is the second crossing.Wait, but earlier I found t1 ≈1.881 and t2≈4.117 months. So, that's the interval where Q(t) >75.But wait, let me check the exact values.We have θ = π t /6.We found that sin(θ) > 5/6 when θ ∈ (arcsin(5/6), π - arcsin(5/6)).So, θ1 = arcsin(5/6) ≈0.9851 radiansθ2 = π - θ1 ≈2.1565 radiansTherefore, t1 = θ1 * 6 / π ≈0.9851 *6 /3.1416≈1.881 monthst2 = θ2 *6 /π≈2.1565*6 /3.1416≈4.117 monthsSo, the flow rate exceeds 75 m³/s between approximately 1.881 months and 4.117 months.But since the sine function is symmetric, we need to check if there's another interval in the second half of the year.Wait, no, because in the second half of the year, the sine function is negative, so it won't exceed 5/6 again.Therefore, the only interval where Q(t) >75 is between t≈1.881 and t≈4.117 months.But let me express these times more precisely.First, let's compute θ1 = arcsin(5/6). Let's find the exact value.We know that sin(θ1) = 5/6, so θ1 = arcsin(5/6). There's no exact expression for this, so we'll have to leave it in terms of arcsin or use the exact expression.But the problem says "exact times", so perhaps we can express t in terms of arcsin.So, let's write:sin(π t /6) = 5/6So, π t /6 = arcsin(5/6) or π t /6 = π - arcsin(5/6)Therefore, solving for t:t = (6/π) arcsin(5/6) or t = (6/π)(π - arcsin(5/6)) = 6 - (6/π) arcsin(5/6)So, the exact times are:t = (6/π) arcsin(5/6) and t = 6 - (6/π) arcsin(5/6)Therefore, the flow rate exceeds 75 m³/s between these two times.So, the exact times are t = (6/π) arcsin(5/6) and t = 6 - (6/π) arcsin(5/6). Therefore, the flow rate is above 75 m³/s for t between these two values.But let me check if that's correct.Wait, when t = (6/π) arcsin(5/6), that's the first time the flow rate reaches 75, and when t = 6 - (6/π) arcsin(5/6), that's the second time it reaches 75 on the way down. So, between these two times, the flow rate is above 75.Yes, that makes sense.So, the exact times when the flow rate exceeds 75 m³/s are between t = (6/π) arcsin(5/6) and t = 6 - (6/π) arcsin(5/6).But let me compute these values numerically to verify.First, compute arcsin(5/6):arcsin(5/6) ≈0.9851 radiansSo, t1 = (6/π)*0.9851 ≈ (6/3.1416)*0.9851 ≈1.881 monthst2 = 6 - 1.881 ≈4.119 monthsWhich matches our earlier approximation.So, the flow rate exceeds 75 m³/s between approximately 1.881 months and 4.119 months.But the problem asks for the exact times, so we need to express them in terms of arcsin.Therefore, the exact times are:t = (6/π) arcsin(5/6) and t = 6 - (6/π) arcsin(5/6)So, the flow rate exceeds 75 m³/s during the interval:( (6/π) arcsin(5/6), 6 - (6/π) arcsin(5/6) )Therefore, the exact times are these two points, and the flow rate is above 75 between them.So, summarizing:1. The total volume is 1,555,200,000 cubic meters.2. The flow rate exceeds 75 m³/s between t = (6/π) arcsin(5/6) and t = 6 - (6/π) arcsin(5/6) months.But let me write the exact values without approximating.So, for problem 1, the total volume is 1,555,200,000 m³.For problem 2, the times are t = (6/π) arcsin(5/6) and t = 6 - (6/π) arcsin(5/6).But perhaps we can express this interval more neatly.Alternatively, since the sine function is symmetric, we can write the solution as:t ∈ ( (6/π) arcsin(5/6), 6 - (6/π) arcsin(5/6) )So, that's the exact interval.Therefore, the exact times when the flow rate exceeds 75 m³/s are between t = (6/π) arcsin(5/6) and t = 6 - (6/π) arcsin(5/6) months.I think that's the answer.**Final Answer**1. The total volume of water is boxed{1555200000} cubic meters.2. The flow rate exceeds 75 cubic meters per second between boxed{frac{6}{pi} arcsinleft(frac{5}{6}right)} and boxed{6 - frac{6}{pi} arcsinleft(frac{5}{6}right)} months.
question:An agricultural extension officer is working with a group of farmers to optimize the irrigation schedule for a large, heterogeneous farm divided into three distinct zones: Zone A, Zone B, and Zone C. The officer has collected data on soil moisture retention, evaporation rates, and crop water needs for each zone. The goal is to maximize crop yield while minimizing water usage.1. The water retention capacity of the soil in each zone is modeled by the following differential equations: - Zone A: ( frac{dW_A(t)}{dt} = -k_A W_A(t) + I_A(t) ) - Zone B: ( frac{dW_B(t)}{dt} = -k_B W_B(t) + I_B(t) ) - Zone C: ( frac{dW_C(t)}{dt} = -k_C W_C(t) + I_C(t) ) Here, (W_i(t)) represents the water content in zone (i) at time (t), (k_i) is the evaporation rate constant for zone (i), and (I_i(t)) is the irrigation input function for zone (i). Given that the evaporation rates (k_A), (k_B), and (k_C) are known constants, and the initial water content in each zone is (W_A(0) = 30) mm, (W_B(0) = 25) mm, and (W_C(0) = 28) mm, determine the irrigation input functions (I_A(t)), (I_B(t)), and (I_C(t)) such that the water content in each zone remains constant at the initial values over time.2. Additionally, each crop type in the three zones has a specific water requirement which must be met to achieve maximum yield. The crop water demand per day for Zone A is 5 mm, for Zone B is 4 mm, and for Zone C is 6 mm. Calculate the total amount of water required for each zone over a 30-day period, and determine the total water savings if the officer implements an optimized irrigation schedule that reduces water usage by 10% while still meeting the crop water requirements.
answer:Okay, so I have this problem about optimizing irrigation schedules for a farm divided into three zones. The goal is to maximize crop yield while minimizing water usage. Let me try to break this down step by step.First, part 1 is about determining the irrigation input functions ( I_A(t) ), ( I_B(t) ), and ( I_C(t) ) such that the water content in each zone remains constant at their initial values over time. The differential equations given are:- Zone A: ( frac{dW_A(t)}{dt} = -k_A W_A(t) + I_A(t) )- Zone B: ( frac{dW_B(t)}{dt} = -k_B W_B(t) + I_B(t) )- Zone C: ( frac{dW_C(t)}{dt} = -k_C W_C(t) + I_C(t) )The initial water contents are ( W_A(0) = 30 ) mm, ( W_B(0) = 25 ) mm, and ( W_C(0) = 28 ) mm. We need to find ( I_A(t) ), ( I_B(t) ), and ( I_C(t) ) so that ( W_A(t) ), ( W_B(t) ), and ( W_C(t) ) remain constant.Hmm, okay. If the water content is to remain constant, that means the derivative ( frac{dW_i(t)}{dt} ) should be zero for all ( t ). So, setting each derivative to zero:For Zone A: ( 0 = -k_A W_A(t) + I_A(t) )Similarly, for Zone B: ( 0 = -k_B W_B(t) + I_B(t) )And for Zone C: ( 0 = -k_C W_C(t) + I_C(t) )Since ( W_A(t) ), ( W_B(t) ), and ( W_C(t) ) are constant at their initial values, we can substitute those in:( I_A(t) = k_A times 30 )( I_B(t) = k_B times 25 )( I_C(t) = k_C times 28 )So, the irrigation input functions are constant functions equal to the product of the evaporation rate constant and the initial water content. That makes sense because if the water is being lost at a rate proportional to the current water content, you need to replace that exact amount to keep it constant.Moving on to part 2. Each crop has specific water requirements per day: Zone A needs 5 mm, Zone B needs 4 mm, and Zone C needs 6 mm. We need to calculate the total water required for each zone over 30 days and then determine the total water savings if the irrigation is optimized to reduce water usage by 10% while still meeting the crop requirements.First, let's compute the total water required without optimization. For each zone, it's just the daily requirement multiplied by 30 days.For Zone A: ( 5 ) mm/day ( times 30 ) days = 150 mmFor Zone B: ( 4 ) mm/day ( times 30 ) days = 120 mmFor Zone C: ( 6 ) mm/day ( times 30 ) days = 180 mmSo, the total water required without optimization is ( 150 + 120 + 180 = 450 ) mm.Now, if the irrigation is optimized to reduce water usage by 10%, the total water used would be 90% of the original amount. So, total optimized water usage is ( 450 times 0.9 = 405 ) mm.Therefore, the water savings would be the difference between the original and optimized totals: ( 450 - 405 = 45 ) mm.Wait, but the problem says "determine the total water savings if the officer implements an optimized irrigation schedule that reduces water usage by 10% while still meeting the crop water requirements." So, does that mean each zone's water usage is reduced by 10%, or the total is reduced by 10%?Hmm, the wording says "reduces water usage by 10%", which is a bit ambiguous. It could be interpreted as reducing the total water usage by 10%, which would be 45 mm as I calculated. Alternatively, it could mean reducing each zone's water usage by 10%, which would be different.But given that the problem mentions "total water savings," I think it refers to the total reduction. So, 10% of the total 450 mm is 45 mm saved.But just to be thorough, if we reduce each zone's water by 10%, then:Zone A: 150 mm - 10% = 135 mmZone B: 120 mm - 10% = 108 mmZone C: 180 mm - 10% = 162 mmTotal optimized water: 135 + 108 + 162 = 405 mmSavings: 450 - 405 = 45 mmSame result. So either way, the total savings are 45 mm.But wait, is that correct? Because if you reduce each zone's water by 10%, the total savings are the same as reducing the total by 10%. That's because 10% of each component adds up to 10% of the total. So, yes, both interpretations lead to the same answer here.Therefore, the total water savings would be 45 mm over the 30-day period.Let me just recap:1. For part 1, the irrigation inputs are constant and equal to ( k_i times W_i(0) ).2. For part 2, total water required is 450 mm, optimized usage is 405 mm, so savings are 45 mm.I think that's it. I don't see any mistakes in my reasoning. The key was recognizing that to keep water content constant, the irrigation must exactly replace the lost water due to evaporation. Then, calculating the total water needed and applying a 10% reduction to find savings.**Final Answer**1. The irrigation input functions are ( I_A(t) = 30k_A ), ( I_B(t) = 25k_B ), and ( I_C(t) = 28k_C ).2. The total water savings over 30 days is boxed{45} mm.
question:An anthropologist is analyzing the cultural significance of various types of furniture from two distinct ancient civilizations: Civilization A and Civilization B. She classifies furniture items into three categories based on their cultural importance: ceremonial, utilitarian, and symbolic. She has collected a dataset that includes the frequency of each type of furniture discovered in archaeological sites and their respective cultural weight scores, which are determined by a combination of historical texts and expert evaluations.For Civilization A, the frequency of ceremonial, utilitarian, and symbolic furniture items is given by the vector ( mathbf{f}_A = (f_{A1}, f_{A2}, f_{A3}) ) and their respective cultural weight scores by the vector ( mathbf{w}_A = (w_{A1}, w_{A2}, w_{A3}) ).For Civilization B, the frequency of ceremonial, utilitarian, and symbolic furniture items is given by the vector ( mathbf{f}_B = (f_{B1}, f_{B2}, f_{B3}) ) and their respective cultural weight scores by the vector ( mathbf{w}_B = (w_{B1}, w_{B2}, w_{B3}) ).1. Define the cultural significance function for a civilization as a weighted sum of the product of frequency and cultural weight scores, ( S = sum_{i=1}^{3} f_i cdot w_i ). Calculate the cultural significance for both Civilizations A and B. Then, determine the difference in cultural significance between the two civilizations, ( Delta S = S_A - S_B ).2. Suppose the anthropologist discovers that the relative importance of each category for both civilizations changes over time according to the exponential decay model for cultural weight scores: ( w_i(t) = w_i cdot e^{-lambda_i t} ), where ( lambda_i ) is the decay constant for each category and ( t ) represents the time in centuries since the initial measurement. Assuming the decay constants ( lambda_i ) are the same for both civilizations, derive an expression for the time ( t ) in terms of ( lambda_i ) and the initial cultural significance scores such that the cultural significance scores of both civilizations are equal.
answer:Alright, so I have this problem about an anthropologist analyzing furniture from two ancient civilizations, A and B. She's looking at their cultural significance based on frequency and weight scores. There are two parts to the problem. Let me try to break them down step by step.Starting with part 1: I need to define a cultural significance function for each civilization. The function is given as a weighted sum, which is the sum of the product of frequency and weight scores for each category. So, for Civilization A, it's S_A = f_A1*w_A1 + f_A2*w_A2 + f_A3*w_A3. Similarly, for Civilization B, it's S_B = f_B1*w_B1 + f_B2*w_B2 + f_B3*w_B3. Then, I need to calculate the difference ΔS = S_A - S_B.Wait, but hold on, the problem doesn't give me specific numbers for the frequencies and weights. It just describes them as vectors. So, maybe I don't need to plug in numbers, just express the formula? Let me check.Yes, the first part is just to define the function and calculate the difference. So, I can write S_A as the dot product of f_A and w_A, same for S_B. Then, ΔS is just S_A minus S_B. That seems straightforward.Moving on to part 2: It says that the cultural weight scores decay exponentially over time. The model is w_i(t) = w_i * e^(-λ_i t), where λ_i is the decay constant and t is time in centuries. The decay constants are the same for both civilizations. I need to derive an expression for time t in terms of λ_i and the initial cultural significance scores such that S_A(t) = S_B(t).Hmm, okay. So, initially, at t=0, S_A and S_B are as calculated in part 1. But as time increases, the weights decay, so the cultural significance changes. I need to find when S_A(t) equals S_B(t).Let me write down the expressions for S_A(t) and S_B(t). Since each weight decays exponentially, the cultural significance at time t would be:S_A(t) = f_A1*w_A1*e^(-λ1 t) + f_A2*w_A2*e^(-λ2 t) + f_A3*w_A3*e^(-λ3 t)Similarly,S_B(t) = f_B1*w_B1*e^(-λ1 t) + f_B2*w_B2*e^(-λ2 t) + f_B3*w_B3*e^(-λ3 t)Wait, but the decay constants λ_i are the same for both civilizations. So, for each category i, λ_i is the same whether it's A or B. That's important.So, we have S_A(t) and S_B(t) as above, and we need to find t such that S_A(t) = S_B(t).Let me denote the initial cultural significances as S_A0 = S_A(0) and S_B0 = S_B(0). So, S_A0 = f_A1*w_A1 + f_A2*w_A2 + f_A3*w_A3, and similarly for S_B0.But in the expressions for S_A(t) and S_B(t), each term is multiplied by an exponential decay factor specific to its category. So, unless all λ_i are the same, the decay rates differ per category.Wait, the problem says "the decay constants λ_i are the same for both civilizations." So, for each category i, λ_i is the same for A and B. So, λ1 is same for both, λ2 same, λ3 same. So, each category has its own decay constant, same across A and B.So, to find t such that S_A(t) = S_B(t). Let's write the equation:f_A1*w_A1*e^(-λ1 t) + f_A2*w_A2*e^(-λ2 t) + f_A3*w_A3*e^(-λ3 t) = f_B1*w_B1*e^(-λ1 t) + f_B2*w_B2*e^(-λ2 t) + f_B3*w_B3*e^(-λ3 t)Let me rearrange terms:[f_A1*w_A1 - f_B1*w_B1] e^(-λ1 t) + [f_A2*w_A2 - f_B2*w_B2] e^(-λ2 t) + [f_A3*w_A3 - f_B3*w_B3] e^(-λ3 t) = 0Let me denote the differences as D1 = f_A1*w_A1 - f_B1*w_B1, D2 = f_A2*w_A2 - f_B2*w_B2, D3 = f_A3*w_A3 - f_B3*w_B3.So, the equation becomes:D1 e^(-λ1 t) + D2 e^(-λ2 t) + D3 e^(-λ3 t) = 0This is a transcendental equation in t, meaning it's not straightforward to solve algebraically. It might require numerical methods unless there's some symmetry or specific values.But the problem asks to derive an expression for t in terms of λ_i and the initial cultural significance scores. Hmm. Maybe we can express it in terms of the differences D1, D2, D3 and the decay constants.Alternatively, perhaps we can factor out some terms. Let me see.Suppose we factor out e^(-λ1 t):e^(-λ1 t) [D1 + D2 e^(- (λ2 - λ1) t) + D3 e^(- (λ3 - λ1) t)] = 0Since e^(-λ1 t) is always positive, the equation reduces to:D1 + D2 e^(- (λ2 - λ1) t) + D3 e^(- (λ3 - λ1) t) = 0This still seems complicated. Maybe if all λ_i are the same, say λ1=λ2=λ3=λ, then the equation simplifies to (S_A0 - S_B0) e^(-λ t) = 0, which would only be zero as t approaches infinity, which doesn't make sense because e^(-λ t) approaches zero, but S_A0 - S_B0 is finite. So, unless S_A0 = S_B0, which would make the difference zero immediately, but that's trivial.But in the problem, the decay constants are the same for both civilizations, but not necessarily the same across categories. So, each category has its own λ_i, same for A and B.Therefore, the equation is:D1 e^(-λ1 t) + D2 e^(-λ2 t) + D3 e^(-λ3 t) = 0This equation likely doesn't have a closed-form solution, so maybe we need to express t implicitly or in terms of logarithms, but it's tricky.Alternatively, perhaps we can take the ratio of S_A(t) to S_B(t) and set it equal to 1, then take logarithms, but that might not help because it's a sum in the numerator and denominator.Wait, let me think differently. Maybe express the equation as:(D1/D3) e^(-λ1 t) + (D2/D3) e^(-λ2 t) + e^(-λ3 t) = 0But that still doesn't help much.Alternatively, maybe assume that one term dominates, but without knowing the relative sizes of D1, D2, D3 and the λ_i, it's hard to say.Alternatively, perhaps take the natural logarithm of both sides, but since it's a sum, that's not straightforward.Wait, another approach: Let me denote x = e^(-λ1 t), y = e^(-λ2 t), z = e^(-λ3 t). Then, the equation becomes D1 x + D2 y + D3 z = 0. But x, y, z are related through t: y = x^{λ2/λ1}, z = x^{λ3/λ1}. So, substituting, we get D1 x + D2 x^{λ2/λ1} + D3 x^{λ3/λ1} = 0.This is still a transcendental equation in x, which might not have an analytical solution unless specific exponents allow factoring.Alternatively, perhaps if all λ_i are proportional, say λ2 = k λ1, λ3 = m λ1, then exponents become powers of x. But unless k and m are integers, it's still complicated.Given that, perhaps the best we can do is express t implicitly in terms of the differences D1, D2, D3 and the decay constants λ1, λ2, λ3.Alternatively, maybe express t as a function involving the Lambert W function or something, but that's probably beyond the scope.Wait, maybe if we consider the case where only one category is present, say only ceremonial furniture, then the equation reduces to D1 e^(-λ1 t) = 0, which only happens as t approaches infinity, which isn't useful.Alternatively, if two categories are present, say D1 and D2, then D1 e^(-λ1 t) + D2 e^(-λ2 t) = 0. Let's solve this case.Let me set D1 e^(-λ1 t) = -D2 e^(-λ2 t)Then, (D1/D2) = - e^{(λ2 - λ1) t}Taking natural log:ln(D1/D2) = (λ2 - λ1) t + ln(-1)But ln(-1) is iπ, which is complex, so no real solution unless D1 and D2 have opposite signs.Wait, but in our case, D1, D2, D3 are real numbers, so if D1 and D2 have opposite signs, then maybe a real solution exists.But in the general case with three terms, it's even more complicated.Given that, perhaps the answer is that there's no general analytical solution, and t must be found numerically. But the problem says "derive an expression," so maybe it expects an implicit equation.Alternatively, perhaps the problem assumes that all decay constants are the same, which would simplify things.Wait, let me check the problem statement again: "the decay constants λ_i are the same for both civilizations." It doesn't say they are the same across categories. So, each category has its own λ_i, same for A and B.So, perhaps the equation is as above, and we can write it as:(D1/D3) e^{-(λ1 - λ3) t} + (D2/D3) e^{-(λ2 - λ3) t} + 1 = 0Let me denote a = λ1 - λ3, b = λ2 - λ3, then:(D1/D3) e^{-a t} + (D2/D3) e^{-b t} + 1 = 0Still, this is a transcendental equation. Maybe we can write it as:C1 e^{-a t} + C2 e^{-b t} = -1Where C1 = D1/D3, C2 = D2/D3.But unless C1 and C2 are specific, this doesn't help.Alternatively, perhaps if we let u = e^{-t}, then e^{-a t} = u^a, e^{-b t} = u^b, so:C1 u^a + C2 u^b = -1Still, this is a nonlinear equation in u, which might not have a closed-form solution.Given that, perhaps the answer is that t must satisfy the equation:D1 e^{-λ1 t} + D2 e^{-λ2 t} + D3 e^{-λ3 t} = 0Which can be written as:(D1/D3) e^{-(λ1 - λ3) t} + (D2/D3) e^{-(λ2 - λ3) t} + 1 = 0But without specific values, this is as far as we can go analytically.Alternatively, maybe we can express t in terms of the initial significances.Let me denote S_A0 = D1 + D2 + D3 + ... Wait, no, S_A0 is the initial significance, which is f_A1*w_A1 + f_A2*w_A2 + f_A3*w_A3, and similarly S_B0 = f_B1*w_B1 + f_B2*w_B2 + f_B3*w_B3.So, D1 = f_A1*w_A1 - f_B1*w_B1, D2 = f_A2*w_A2 - f_B2*w_B2, D3 = f_A3*w_A3 - f_B3*w_B3.So, the equation is:(D1) e^{-λ1 t} + (D2) e^{-λ2 t} + (D3) e^{-λ3 t} = 0We can factor out e^{-λ3 t}:e^{-λ3 t} [D1 e^{-(λ1 - λ3) t} + D2 e^{-(λ2 - λ3) t} + D3] = 0Since e^{-λ3 t} is never zero, we have:D1 e^{-(λ1 - λ3) t} + D2 e^{-(λ2 - λ3) t} + D3 = 0Let me denote α = λ1 - λ3, β = λ2 - λ3, then:D1 e^{-α t} + D2 e^{-β t} + D3 = 0This is still a transcendental equation. Maybe we can write it as:D1 e^{-α t} + D2 e^{-β t} = -D3But unless we can express this in terms of logarithms, which isn't straightforward because of the sum, we can't solve for t explicitly.Alternatively, perhaps if we take the ratio of the two sides or use some approximation, but that's beyond the scope.Given that, perhaps the answer is that t must satisfy the equation:(D1/D3) e^{-(λ1 - λ3) t} + (D2/D3) e^{-(λ2 - λ3) t} + 1 = 0Which can be written as:(D1/D3) e^{-α t} + (D2/D3) e^{-β t} + 1 = 0Where α = λ1 - λ3 and β = λ2 - λ3.Alternatively, maybe express t in terms of the Lambert W function if possible, but I don't see a straightforward way.Alternatively, perhaps the problem expects us to recognize that the time t when S_A(t) = S_B(t) is when the weighted sum of the differences multiplied by their respective decay factors equals zero, which is the equation we derived.So, in conclusion, the expression for t is the solution to:D1 e^{-λ1 t} + D2 e^{-λ2 t} + D3 e^{-λ3 t} = 0Where D1 = f_A1 w_A1 - f_B1 w_B1, D2 = f_A2 w_A2 - f_B2 w_B2, D3 = f_A3 w_A3 - f_B3 w_B3.Alternatively, we can write it as:(f_A1 w_A1 - f_B1 w_B1) e^{-λ1 t} + (f_A2 w_A2 - f_B2 w_B2) e^{-λ2 t} + (f_A3 w_A3 - f_B3 w_B3) e^{-λ3 t} = 0This is the implicit equation that t must satisfy.So, summarizing:1. Cultural significance for A: S_A = f_A1 w_A1 + f_A2 w_A2 + f_A3 w_A3Cultural significance for B: S_B = f_B1 w_B1 + f_B2 w_B2 + f_B3 w_B3Difference: ΔS = S_A - S_B2. The time t when S_A(t) = S_B(t) is given by the solution to:(f_A1 w_A1 - f_B1 w_B1) e^{-λ1 t} + (f_A2 w_A2 - f_B2 w_B2) e^{-λ2 t} + (f_A3 w_A3 - f_B3 w_B3) e^{-λ3 t} = 0Which is the expression we need to derive.I think that's as far as we can go analytically. So, the answer for part 2 is the equation above, which defines t implicitly in terms of the given parameters.
question:Alex, who is not particularly a fan of rock music, decides to attend a series of concerts to enjoy the atmosphere. Alex plans to attend a total of 6 concerts over the next 3 months. Each month, the number of concerts Alex attends follows a Poisson distribution, but the rate parameter (λ) for each month varies because of different concert schedules:- For January, the rate parameter λ is 1.5.- For February, the rate parameter λ is 2.- For March, the rate parameter λ is 2.5.1. Calculate the probability that Alex attends exactly 2 concerts in January, 1 concert in February, and 3 concerts in March.2. Given that Alex attends a total of 6 concerts over the 3 months, calculate the conditional probability that Alex attends exactly 2 concerts in March.
answer:Okay, so I have this problem about Alex attending concerts over three months, and I need to calculate two probabilities. Let me try to break this down step by step.First, the problem says that Alex is attending a total of 6 concerts over January, February, and March. Each month, the number of concerts he attends follows a Poisson distribution with different rate parameters: 1.5 for January, 2 for February, and 2.5 for March.The first question is asking for the probability that Alex attends exactly 2 concerts in January, 1 in February, and 3 in March. Hmm, okay. Since each month is independent, I think I can calculate the probabilities for each month separately and then multiply them together to get the joint probability.So, for January, the number of concerts follows a Poisson distribution with λ = 1.5. The formula for the Poisson probability mass function is P(X = k) = (λ^k * e^(-λ)) / k!. So, for January, P(X=2) would be (1.5^2 * e^(-1.5)) / 2!.Similarly, for February, λ is 2, and we want P(Y=1). That would be (2^1 * e^(-2)) / 1!.For March, λ is 2.5, and we want P(Z=3). So, that's (2.5^3 * e^(-2.5)) / 3!.Then, since these are independent events, the total probability is the product of these three probabilities. Let me write that down:P(Jan=2, Feb=1, Mar=3) = P(X=2) * P(Y=1) * P(Z=3)So, let me compute each part.First, P(X=2):1.5 squared is 2.25. e^(-1.5) is approximately... let me recall, e^(-1) is about 0.3679, so e^(-1.5) is roughly 0.2231. Then, 2.25 * 0.2231 is approximately 0.502. Then, divide by 2! which is 2. So, 0.502 / 2 is approximately 0.251.Wait, let me double-check that calculation. 1.5^2 is indeed 2.25. e^(-1.5) is approximately 0.2231. So, 2.25 * 0.2231 is 0.502. Divided by 2, that's 0.251. So, P(X=2) ≈ 0.251.Next, P(Y=1):2^1 is 2. e^(-2) is approximately 0.1353. So, 2 * 0.1353 is 0.2706. Divided by 1! which is 1, so P(Y=1) ≈ 0.2706.Then, P(Z=3):2.5^3 is 15.625. e^(-2.5) is approximately 0.0821. So, 15.625 * 0.0821 is approximately 1.281. Divided by 3! which is 6, so 1.281 / 6 ≈ 0.2135.So, putting it all together, the joint probability is 0.251 * 0.2706 * 0.2135.Let me calculate that step by step.First, 0.251 * 0.2706. Let me compute 0.25 * 0.27 is 0.0675, and then the extra 0.001 * 0.2706 is about 0.0002706, so total is approximately 0.06777.Then, multiply that by 0.2135. So, 0.06777 * 0.2135. Let me approximate:0.06 * 0.2135 = 0.012810.00777 * 0.2135 ≈ 0.00166Adding them together: 0.01281 + 0.00166 ≈ 0.01447.So, approximately 0.0145.Wait, let me check if I did that correctly. Alternatively, I can compute 0.251 * 0.2706 first:0.251 * 0.2706:Let me compute 251 * 2706 first, then adjust the decimal.251 * 2706: 251 * 2000 = 502,000; 251 * 700 = 175,700; 251 * 6 = 1,506. So total is 502,000 + 175,700 = 677,700 + 1,506 = 679,206.So, 0.251 * 0.2706 = 0.0679206.Then, 0.0679206 * 0.2135:Compute 0.0679206 * 0.2 = 0.013584120.0679206 * 0.0135 = approximately 0.000916.Adding together: 0.01358412 + 0.000916 ≈ 0.0145.So, approximately 0.0145. So, the probability is roughly 1.45%.Hmm, that seems low, but considering the Poisson probabilities, maybe it's correct.Alternatively, maybe I should use more precise values for e^(-λ).Let me recalculate with more precise e^(-λ) values.For January: e^(-1.5) is approximately 0.22313016.So, 1.5^2 is 2.25. 2.25 * 0.22313016 = 0.50204286. Divided by 2 is 0.25102143.February: e^(-2) is approximately 0.13533528. 2 * 0.13533528 = 0.27067056.March: e^(-2.5) is approximately 0.08208500. 2.5^3 is 15.625. 15.625 * 0.082085 = 1.282578125. Divided by 6 is 0.21376302.So, now, multiplying these precise values:0.25102143 * 0.27067056 * 0.21376302.First, multiply the first two: 0.25102143 * 0.27067056.Let me compute 0.25102143 * 0.27067056:0.25 * 0.27 = 0.06750.25 * 0.00067056 = ~0.000167640.00102143 * 0.27067056 ≈ ~0.000276Adding these together: 0.0675 + 0.00016764 + 0.000276 ≈ 0.06794364.Then, multiply by 0.21376302:0.06794364 * 0.21376302.Compute 0.06 * 0.21376302 = 0.012825780.00794364 * 0.21376302 ≈ ~0.001696Adding together: 0.01282578 + 0.001696 ≈ 0.01452178.So, approximately 0.01452, or 1.452%.So, about 1.45%.Okay, so that's the first part. So, the probability is approximately 0.0145 or 1.45%.Now, moving on to the second question: Given that Alex attends a total of 6 concerts over the 3 months, calculate the conditional probability that Alex attends exactly 2 concerts in March.So, this is a conditional probability. The formula for conditional probability is P(A|B) = P(A ∩ B) / P(B).In this case, A is the event that Alex attends exactly 2 concerts in March, and B is the event that he attends a total of 6 concerts over the three months.But wait, actually, since we're given that the total is 6, and we want the probability that March is exactly 2, we can model this as a multinomial distribution.Wait, but each month is independent Poisson, so the joint distribution is Poisson with parameters λ1, λ2, λ3. The total number of concerts is Poisson with λ = λ1 + λ2 + λ3.But in this case, the total is fixed at 6, so we need the conditional probability.Alternatively, since the three months are independent Poisson variables, the conditional distribution of the number in March given the total is multinomial.Wait, actually, when you have independent Poisson variables, the conditional distribution given the total is a multinomial distribution with parameters n = total, and probabilities proportional to their λs.So, in this case, the total λ is 1.5 + 2 + 2.5 = 6.So, the probability that March has exactly 2 given that the total is 6 is equal to the multinomial probability with n=6, k1=2, and probabilities p1 = λ1 / total λ, p2 = λ2 / total λ, p3 = λ3 / total λ.Wait, let me think again.Yes, because if X, Y, Z are independent Poisson(λ1), Poisson(λ2), Poisson(λ3), then given X + Y + Z = n, the distribution of (X, Y, Z) is multinomial with parameters n and probabilities p1 = λ1/(λ1 + λ2 + λ3), p2 = λ2/(λ1 + λ2 + λ3), p3 = λ3/(λ1 + λ2 + λ3).So, in this case, n=6, and we want the probability that Z=2, which is the number in March.So, the probability is C(6, 2) * (p3)^2 * (1 - p3)^(6 - 2), where p3 = λ3 / (λ1 + λ2 + λ3).Wait, but actually, it's multinomial, so it's 6! / (x! y! z!) * (p1)^x (p2)^y (p3)^z, where x + y + z = 6.But since we're only conditioning on the total, and we want the probability that Z=2, we can think of it as the sum over all x and y such that x + y + 2 = 6, i.e., x + y = 4, of the multinomial probabilities.But actually, since the multinomial distribution is symmetric, the probability that Z=2 is equal to C(6, 2) * (p3)^2 * (1 - p3)^4, but wait, no, that's binomial. But in multinomial, it's more involved.Wait, perhaps it's better to compute it as:P(Z=2 | X + Y + Z = 6) = P(Z=2, X + Y =4) / P(X + Y + Z =6)But since X, Y, Z are independent Poisson, P(Z=2, X + Y =4) = P(Z=2) * P(X + Y =4). Because Z is independent of X and Y.Similarly, P(X + Y + Z =6) = P(X + Y + Z=6).But X + Y is Poisson with λ = 1.5 + 2 = 3.5, and Z is Poisson with λ=2.5, so X + Y + Z is Poisson with λ=6.So, P(X + Y + Z=6) = e^(-6) * 6^6 / 6!.Similarly, P(Z=2) is e^(-2.5) * (2.5)^2 / 2!.P(X + Y=4) is e^(-3.5) * (3.5)^4 / 4!.Therefore, P(Z=2, X + Y=4) = [e^(-2.5) * (2.5)^2 / 2!] * [e^(-3.5) * (3.5)^4 / 4!] = e^(-6) * (2.5)^2 * (3.5)^4 / (2! 4!).Therefore, the conditional probability is [e^(-6) * (2.5)^2 * (3.5)^4 / (2! 4!)] / [e^(-6) * 6^6 / 6!].Simplify this:The e^(-6) cancels out.So, numerator: (2.5)^2 * (3.5)^4 / (2! 4!) = (6.25) * (150.0625) / (2 * 24) = (6.25 * 150.0625) / 48.Wait, let me compute 2.5 squared: 6.25. 3.5 to the 4th power: 3.5^2=12.25, so 12.25^2=150.0625.So, numerator: 6.25 * 150.0625 = let's compute that.6 * 150.0625 = 900.3750.25 * 150.0625 = 37.515625Total: 900.375 + 37.515625 = 937.890625Denominator: 2! * 4! = 2 * 24 = 48.So, numerator / denominator = 937.890625 / 48 ≈ 19.539388.Denominator of the conditional probability is 6^6 / 6!.Compute 6^6: 6*6=36, 36*6=216, 216*6=1296, 1296*6=7776, 7776*6=46656.6! = 720.So, 46656 / 720 = 64.8.Therefore, the conditional probability is 19.539388 / 64.8 ≈ 0.299.So, approximately 0.299, or 29.9%.Wait, let me check that calculation again.Wait, 6^6 is 46656, 6! is 720, so 46656 / 720 = 64.8.Numerator was 937.890625 / 48 ≈ 19.539388.So, 19.539388 / 64.8 ≈ 0.299.Yes, so approximately 0.299, or 29.9%.Alternatively, another way to think about it is using the multinomial coefficients.Given that the total is 6, the probability that March has exactly 2 is equal to the multinomial probability with n=6, k3=2, and probabilities p1=1.5/6=0.25, p2=2/6≈0.3333, p3=2.5/6≈0.4167.So, the probability is C(6,2) * (0.4167)^2 * (1 - 0.4167)^(6 - 2).Wait, but actually, it's a multinomial, so it's 6! / (x! y! 2!) * (0.25)^x * (0.3333)^y * (0.4167)^2, summed over all x + y =4.But that's more complicated.Alternatively, the probability is equal to the number of ways to distribute 6 concerts such that March has 2, and the rest are distributed between January and February, weighted by their probabilities.But perhaps the first method I used is more straightforward.Alternatively, I can compute it as:P(Z=2 | X+Y+Z=6) = [P(Z=2) * P(X+Y=4)] / P(X+Y+Z=6)Which is the same as before.So, let me compute each part numerically.First, P(Z=2):λ = 2.5, k=2.P(Z=2) = (2.5^2 * e^(-2.5)) / 2! ≈ (6.25 * 0.082085) / 2 ≈ (0.51253125) / 2 ≈ 0.256265625.Next, P(X+Y=4):X ~ Poisson(1.5), Y ~ Poisson(2), so X+Y ~ Poisson(3.5).Thus, P(X+Y=4) = (3.5^4 * e^(-3.5)) / 4!.Compute 3.5^4: 3.5^2=12.25, so 12.25^2=150.0625.e^(-3.5) ≈ 0.03019738.So, 150.0625 * 0.03019738 ≈ 4.5306.Divide by 4! =24: 4.5306 /24 ≈ 0.188775.So, P(X+Y=4) ≈ 0.188775.Then, P(Z=2) * P(X+Y=4) ≈ 0.256265625 * 0.188775 ≈ 0.04835.Now, P(X+Y+Z=6):Total λ=6, so P= (6^6 * e^(-6)) /6! ≈ (46656 * 0.002478752) /720 ≈ (115.743) /720 ≈ 0.1613.So, the conditional probability is 0.04835 / 0.1613 ≈ 0.2997, which is approximately 0.3, or 30%.So, that matches the previous calculation.Therefore, the conditional probability is approximately 0.3, or 30%.So, to summarize:1. The probability of exactly 2 in Jan, 1 in Feb, and 3 in March is approximately 1.45%.2. The conditional probability of exactly 2 in March given a total of 6 concerts is approximately 30%.I think that's it.**Final Answer**1. The probability is boxed{0.0145}.2. The conditional probability is boxed{0.30}.
question:A skilled notator is working on transcribing a complex orchestral piece. The composer's handwritten scores are written in such a way that each page contains a different number of measures, ranging from 20 to 30 measures per page, and each measure can contain a varying number of notes, ranging from 5 to 10 notes per measure. The entire orchestral piece is composed of 120 pages of handwritten scores.1. Assuming the number of measures per page and the number of notes per measure are uniformly distributed, calculate the expected total number of notes in the entire piece.2. If the notator can transcribe 1,000 notes per day on average, and each page requires an additional 20 minutes of formatting time independent of the number of notes, estimate the total number of days the notator will need to complete the transcription. Assume the notator works 8 hours per day and round your answer to the nearest whole number.
answer:Okay, so I have this problem about transcribing an orchestral piece. Let me try to break it down step by step.First, the piece is 120 pages long. Each page has a different number of measures, ranging from 20 to 30 measures per page. Each measure has between 5 to 10 notes. The first question is asking for the expected total number of notes in the entire piece, assuming both the number of measures per page and notes per measure are uniformly distributed.Hmm, uniform distribution means each outcome has an equal chance. So for measures per page, it's from 20 to 30. That's 11 possible values (20,21,...,30). Similarly, notes per measure are from 5 to 10, which is 6 possible values.I think I need to find the expected number of measures per page and the expected number of notes per measure, then multiply them together and by the number of pages.For measures per page: the expected value (E[M]) for a uniform distribution from a to b is (a + b)/2. So here, a=20, b=30. So E[M] = (20 + 30)/2 = 25 measures per page.Similarly, for notes per measure: a=5, b=10. So E[N] = (5 + 10)/2 = 7.5 notes per measure.Therefore, the expected number of notes per page is E[M] * E[N] = 25 * 7.5. Let me calculate that: 25*7 is 175, and 25*0.5 is 12.5, so total 187.5 notes per page.Since there are 120 pages, the total expected number of notes is 120 * 187.5. Let me compute that. 120*180 is 21,600, and 120*7.5 is 900, so total is 21,600 + 900 = 22,500 notes.Wait, that seems straightforward. So the expected total number of notes is 22,500.Moving on to the second question. The notator can transcribe 1,000 notes per day on average. Each page requires an additional 20 minutes of formatting time, independent of the number of notes. We need to estimate the total number of days needed, assuming the notator works 8 hours per day.First, let's figure out how much time the notator spends per page. There's the transcription time and the formatting time.Transcription time depends on the number of notes. Since the notator can do 1,000 notes per day, that's 1,000 notes / 8 hours = 125 notes per hour, or 125/60 ≈ 2.0833 notes per minute.But maybe it's easier to think in terms of time per note. If 1,000 notes take 8 hours, which is 480 minutes, then time per note is 480/1000 = 0.48 minutes per note.But wait, actually, maybe it's better to calculate the total transcription time and total formatting time separately, then convert everything into days.Total notes are 22,500. At 1,000 notes per day, that would take 22,500 / 1,000 = 22.5 days for transcription alone.But there's also formatting time. Each page takes 20 minutes, regardless of notes. There are 120 pages, so total formatting time is 120 * 20 = 2,400 minutes.Convert that into days. The notator works 8 hours per day, which is 480 minutes.So total time needed is transcription time + formatting time. Transcription time is 22.5 days, and formatting time is 2,400 minutes.Wait, but we need to convert formatting time into days as well. 2,400 minutes / 480 minutes per day = 5 days.So total time is 22.5 + 5 = 27.5 days. Since we can't have half a day, we round to the nearest whole number, which is 28 days.But wait, let me double-check. Is the transcription time 22.5 days and formatting time 5 days, so total 27.5, which rounds to 28? Yes, that seems right.Alternatively, maybe I should calculate the total time in minutes and then convert to days.Total transcription time: 22,500 notes * (480 minutes / 1,000 notes) = 22,500 * 0.48 = 10,800 minutes.Total formatting time: 120 pages * 20 minutes = 2,400 minutes.Total time: 10,800 + 2,400 = 13,200 minutes.Convert to days: 13,200 / 480 = 27.5 days, which is 27.5, rounds to 28 days. Yep, same result.So the total number of days needed is 28.**Final Answer**1. The expected total number of notes is boxed{22500}.2. The estimated total number of days needed is boxed{28}.
question:A social worker and a pastor are working together to help individuals in crisis by providing them with moral clarity. They organize counseling sessions where they address various issues. The number of individuals attending these sessions can be modeled by a function ( f(t) = 5t^2 + 2t + 1 ), where ( t ) represents the number of weeks since the sessions started.1. Find the total number of individuals who have attended the sessions over the first 10 weeks.2. To better understand the effectiveness of their work, they conduct a survey at the end of each session to measure the moral clarity gained by the attendees. The moral clarity score is given by the integral ( int_0^t (3x^2 + 4x + 2) , dx ), where ( x ) represents the time in hours since the start of the session. Calculate the total moral clarity score accumulated over the first 2 hours of a session.
answer:Alright, so I have two math problems here that I need to solve. Let me take them one at a time and think through each step carefully. Starting with the first problem: 1. **Find the total number of individuals who have attended the sessions over the first 10 weeks.**The function given is ( f(t) = 5t^2 + 2t + 1 ), where ( t ) is the number of weeks since the sessions started. Hmm, okay. So, this function models the number of individuals attending each week. But wait, the question is asking for the total number over the first 10 weeks. That means I need to sum up the number of attendees each week from week 1 to week 10.Wait, hold on. Is ( f(t) ) the number of attendees in week ( t ) or the cumulative number up to week ( t )? The wording says, "the number of individuals attending these sessions can be modeled by ( f(t) )", so I think it's the number attending each week, not the cumulative total. So, to get the total over 10 weeks, I need to calculate the sum of ( f(t) ) from ( t = 1 ) to ( t = 10 ).Alternatively, maybe ( f(t) ) is the cumulative number up to week ( t ). Hmm, the wording is a bit ambiguous. Let me re-read it: "the number of individuals attending these sessions can be modeled by a function ( f(t) = 5t^2 + 2t + 1 )", where ( t ) is the number of weeks since the sessions started. So, it sounds like ( f(t) ) gives the number of attendees at week ( t ). So, for each week, the number of attendees is given by that function. So, to get the total over 10 weeks, I need to sum ( f(1) + f(2) + ... + f(10) ).Alternatively, if ( f(t) ) is the cumulative number, then ( f(10) ) would be the total. But the wording says "the number of individuals attending these sessions can be modeled by...", which suggests it's the number attending each week, not the cumulative. So, I think it's the former: sum from t=1 to t=10.But just to be thorough, let me check both interpretations.First, if ( f(t) ) is the number attending each week, then total is sum from t=1 to t=10 of ( 5t^2 + 2t + 1 ).Alternatively, if ( f(t) ) is cumulative, then total is just ( f(10) ).Which interpretation is correct? The function is given as ( f(t) = 5t^2 + 2t + 1 ). If it were cumulative, it would probably be phrased as "the total number of individuals who have attended up to week t". Since it's phrased as "the number of individuals attending these sessions can be modeled by...", it's more likely the number per week.So, I think the first interpretation is correct: sum from t=1 to t=10.Therefore, I need to compute the sum ( sum_{t=1}^{10} (5t^2 + 2t + 1) ).I can break this sum into three separate sums:( 5 sum_{t=1}^{10} t^2 + 2 sum_{t=1}^{10} t + sum_{t=1}^{10} 1 ).I remember the formulas for these sums:- Sum of squares: ( sum_{t=1}^{n} t^2 = frac{n(n+1)(2n+1)}{6} )- Sum of first n natural numbers: ( sum_{t=1}^{n} t = frac{n(n+1)}{2} )- Sum of 1 n times: ( sum_{t=1}^{n} 1 = n )So, plugging in n=10:First term: ( 5 times frac{10 times 11 times 21}{6} )Second term: ( 2 times frac{10 times 11}{2} )Third term: ( 1 times 10 )Let me compute each term step by step.First term:Compute ( frac{10 times 11 times 21}{6} ).10*11=110110*21=23102310/6=385So, first term is 5*385=1925Second term:Compute ( frac{10 times 11}{2} ).10*11=110110/2=55So, second term is 2*55=110Third term:10So, total sum is 1925 + 110 + 10 = 2045Therefore, the total number of individuals over the first 10 weeks is 2045.Wait, let me double-check my calculations.First term: 5*(10*11*21)/610*11=110110*21=23102310/6=3855*385=1925. Correct.Second term: 2*(10*11)/210*11=110110/2=552*55=110. Correct.Third term: 10. Correct.Total: 1925+110=2035; 2035+10=2045. Yes, that's correct.Alternatively, if I had thought ( f(t) ) was cumulative, then f(10)=5*(10)^2 + 2*10 +1=500 +20 +1=521. But 521 is way less than 2045, and since the function is quadratic, the cumulative number would be much higher. So, 2045 seems more reasonable as the total over 10 weeks.So, I think 2045 is the correct answer for the first question.Moving on to the second problem:2. **Calculate the total moral clarity score accumulated over the first 2 hours of a session.**The moral clarity score is given by the integral ( int_0^t (3x^2 + 4x + 2) , dx ), where ( x ) represents the time in hours since the start of the session. So, they want the total score over the first 2 hours, which would be ( int_0^2 (3x^2 + 4x + 2) , dx ).Alright, so I need to compute this definite integral from 0 to 2.Let me recall how to integrate polynomials term by term.The integral of ( 3x^2 ) is ( x^3 ) because the integral of ( x^n ) is ( frac{x^{n+1}}{n+1} ). So, 3x^2 integrates to ( 3*(x^3)/3 = x^3 ).Similarly, the integral of ( 4x ) is ( 2x^2 ) because 4x integrates to ( 4*(x^2)/2 = 2x^2 ).The integral of 2 is ( 2x ) because the integral of a constant is the constant times x.So, putting it all together, the antiderivative is ( x^3 + 2x^2 + 2x ).Now, evaluate this from 0 to 2.Compute at upper limit (2):( (2)^3 + 2*(2)^2 + 2*(2) = 8 + 8 + 4 = 20 )Compute at lower limit (0):( (0)^3 + 2*(0)^2 + 2*(0) = 0 + 0 + 0 = 0 )Subtract lower limit from upper limit: 20 - 0 = 20.So, the total moral clarity score accumulated over the first 2 hours is 20.Wait, let me double-check the integration.Integral of 3x² is x³, correct.Integral of 4x is 2x², correct.Integral of 2 is 2x, correct.So, antiderivative is x³ + 2x² + 2x.At x=2: 8 + 8 + 4 = 20.At x=0: 0.Difference is 20. So, correct.Alternatively, I can compute the integral step by step.Compute the integral:( int_0^2 (3x^2 + 4x + 2) dx = [x^3 + 2x^2 + 2x]_0^2 )Plugging in 2: 8 + 8 + 4 = 20Plugging in 0: 0Thus, 20 - 0 = 20.Yes, that's correct.Therefore, the total moral clarity score is 20.So, summarizing:1. Total number of individuals over first 10 weeks: 20452. Total moral clarity score over first 2 hours: 20I think that's all. Let me just make sure I didn't make any arithmetic errors.For the first problem, the sum was 5*(sum of squares) + 2*(sum of t) + sum of 1.Sum of squares from 1 to 10 is 385, multiplied by 5 is 1925.Sum of t from 1 to 10 is 55, multiplied by 2 is 110.Sum of 1 ten times is 10.Total: 1925 + 110 = 2035; 2035 +10=2045. Correct.For the integral, each term integrated correctly, evaluated at 2 gives 20, which seems right.Yes, I think both answers are correct.**Final Answer**1. The total number of individuals is boxed{2045}.2. The total moral clarity score is boxed{20}.